Mooring Dolphin Walkway
Mooring Dolphin Walkway Upgrade
Maintaining safe access to critical marine infrastructure requires engineering solutions that balance durability, functionality and personnel safety.
SIE was engaged to design a replacement walkway for our client's mooring dolphin access, with careful consideration given to its proximity to snap-back zones.
Our team completed the structural design, analysis and connection detailing, while also providing technical support throughout fabrication and on-site engineering assistance during installation.
The 35m span walkway was successfully crane-lifted into position under SIE supervision, delivering a safe and reliable access solution for ongoing operations.
Get in touch
Let us know how we can help you.

