Our Projects

Explore Some Complex Projects the SIE Team Has Worked On, and Solutions We Have Delivered for Our Clients

Engineering advanced analysis of hopper skirt deflection used to identify performance issues and improve operational reliability.

Hopper Skirt Deflection

Advanced analysis by SIE resolved complex structural behaviour issues, reducing interface concerns and boosting reliability across plant assets.

See Project Video
Mooring winch guard installation providing snap back protection and enhancing safety for personnel operating in berthing areas.

Mooring Winch Guards

3D reality model capture enabled SIE to engineer accurate, clash‑free guarding for a mooring winch, ensuring accurate and efficient installation.

See Project Video
3D photogrammetry scan of a stacker generating detailed asset data for inspections, defect mapping, engineering assessments, and maintenance planning.

Reality Model 3D Scan

SIE’s 3D reality modelling services help identify defects, simplify contractor navigation, and enhance safe, predictable maintenance planning.

See Project Video
Engineered support system for E-Crane counterweight strut enabling safe connection rod replacement and reducing maintenance risks.

E-Crane Counterweight Restraint Design

Engineered restraint solutions for an E‑Crane by SIE, ensuring stability, compliance, and safe execution of the maintenance procedure.

See Project Video
Structural analysis study of a mooring bollard to verify capacity, improve marine asset reliability, and support safe vessel operations for mining, ports and heavy industry.

Mooring Bollard Integrity Review

Targeted engineering by SIE delivered modern bollard and bolt upgrades, reducing mooring related risks and strengthening port infrastructure.

See Project Video
Stacker jacking and weighing actions completed as part of an engineering audit to verify load distribution and asset condition.

Balanced Machine Weighing

Accurate weighing and engineered jacking solutions by SIE ensured verified stability and safe, reliable machine operation.

See Project Video
Wharf extension project enabling conveyor upgrades, extending the life of the asset, mitigating risk, increasing operational capacity, and supporting long-term port infrastructure performance.

Wharf Conveyor Support Upgrade

Designed and delivered an upgraded conveyor support system, ensuring uninterrupted production and long-term reliability.

See Project Video
Tie pin replacement on a shipunloader restoring structural performance, improving reliability, and supporting continued terminal operations.

Shipunloader Tie-Pin Replacement

Engineered and executed a controlled tie‑pin repair procedure on a shipunloader, ensuring safe restoration and timely return to service.

See Project Video
Hopper spill tray replacement project completed to improve material containment, reduce spillage, and enhance operational efficiency for marine port facilities.

Hopper Spill Tray Replacement

Reverse engineered spill trays using site measurements and 3D modelling to deliver accurate, fabrication ready drawings.

See Project Video
 
Tripper upgrade project delivering asset life extension, improved reliability, and continued performance in bulk materials handling operations.

Tripper Upgrade

SIE developed a mast support solution that reduced truss loading, extended asset life and improved the safe, reliable operation of this tripper.

See Project Video
Structural engineering project involving the relocation of a berth light tower at a port facility to improve operational infrastructure and asset performance.

Lighting Tower Relocation

SIE designed and delivered new berth lighting tower supports, providing a safe, reliable relocation solution that maintains ongoing port operations.

See Project Video
Shuttle replacement project completed to extend the life of the asset, improve equipment reliability, operational performance, and long-term asset availability.

Shuttle Replacement

SIE delivered the structural design for a replacement shuttle, providing a safe & reliable solution meeting operational requirements & demanding schedule.

See Project Video
filter-house-roof-3D-scan-and-design-overlay-project

Filter House Roof 3D Scan & Design Overlay

SIE used 3D reality capture to develop a permanent filter house roof design, avoiding clashes and reducing project risk.

See Project Video
Conveyor plinth replacement project completed to improve structural integrity, extend asset life, and support safe conveyor operations.

Conveyor Plinth Replacement

SIE rapidly delivered temporary & permanent engineering solutions, restoring safe operations & minimising downtime following a critical incident.

See Project Video
Mooring dolphin walkway replacement with snap back protection improving personnel safety, access reliability, and marine infrastructure performance.

Mooring Dolphin Walkway Upgrade

A new access walkway designed by SIE delivered safe and reliable mooring dolphin access, supporting ongoing port operations and personnel safety.

See Project Video

We Have Experience Over a Broad Range of Mining, Ports and Heavy Industry Infrastructure. These Include:

Sketch of a stacker machine used for stockpile management and bulk material handling in mining operations. Asset inspected by Structural Integrity Engineering for condition assessment, maintenance planning, and structural integrity management.

 

Stackers

stacker pilbara western australia balanced machine, bulk handling structural engineering assessments condition and risk management. Mining, Ports & Heavy Industry Support.

 

Sketch illustration of a bucketwheel reclaimer used for bulk material handling in mining and heavy industrial stockpile operations

 

Reclaimers

Bucket wheel reclaimer pilbara western australia balanced machine, bulk handling structural engineering assessments condition and risk management

 

Sketch of a shiploader used for bulk material loading at export terminals and port facilities. Asset inspected by Structural Integrity Engineering for condition assessment, maintenance planning, and structural integrity management.

 

Shiploaders

shiploader pilbara western australia bulk handling machine, structural engineering assessments condition and risk management. Mining, Ports & Heavy Industry Support.

 

Sketch of a ship unloader used for efficient bulk cargo transfer at ports and maritime terminals. Asset inspected by Structural Integrity Engineering for condition assessment, maintenance planning, and structural integrity management.



 

Unloaders

tripper western australia supporting bulk handling machines, structural engineering assessments condition and risk management. Mining, Ports, Heavy Industry Support.

 

Sketch of a conveyor tripper used to distribute bulk materials across stockpiles, to and from balanced machines, and storage facilities. Asset inspected by Structural Integrity Engineering for condition assessment, maintenance planning, and structural integrity management.

 

Trippers

tripper western australia bulk handling machines, structural engineering assessments condition and risk management. Mining, Ports, Heavy Industry Support.

 

Sketch of a train unloader used to transfer bulk materials from rail wagons to processing facilities. Asset inspected by Structural Integrity Engineering for condition assessment, maintenance planning, and structural integrity management.

Train Unloaders

bulk material train unloading western australia, structural engineering assessments condition and risk management. Mining, Ports, Heavy Industry Support.

 

Sketch of a light tower providing site illumination for construction, mining, and industrial facilities. Asset inspected by Structural Integrity Engineering for condition assessment, maintenance planning, and structural integrity management.

 

Towers

berth lighting tower upgrade for port facilities western australia. Pile design and site support. Structural engineering assessments condition and risk management. Mining, Ports, Heavy Industry Support.

 

Sketch of fixed plant infrastructure used in mining, processing, and heavy industrial operations. Assets inspected by Structural Integrity Engineering for condition assessment, maintenance planning, and structural integrity management.

Fixed Plant Facilities

fixed plant facilities western australia mining, bulk handling support, structural engineering assessments condition and risk management

 

Sketch of an industrial conveyor system used for bulk material transport in mining, ports, and processing facilities. Asset inspected by Structural Integrity Engineering for condition assessment, maintenance planning, and structural integrity management.

 

Conveyor Systems

conveyor systems supporting bulk handling balanced machines for mining, ports and heavy industry western australia. structural engineering assessments condition and risk management

 

Sketch of industrial rail trackwork supporting freight transport, mining logistics, balanced machines, and heavy haul infrastructure. Asset inspected by Structural Integrity Engineering for condition assessment, maintenance planning, and structural integrity management.

 

Rail

Rail Trackwork supporting balanced machines, bulk handling assets for mining, ports and heavy industry. structural engineering assessments condition and risk management

 

Sketch of port facilities supporting bulk cargo handling, shipping operations, and maritime infrastructure. Asset inspected by Structural Integrity Engineering for condition assessment, maintenance planning, and structural integrity management.

 

Port Facilities

port facilities western australia supporting balanced machines and bulk handling assets. structural engineering assessments condition and risk management

 

Sketch of a marine mooring bollard used for vessel berthing and port infrastructure operations. Asset inspected by Structural Integrity Engineering for condition assessment, maintenance planning, and structural integrity management.

 

Mooring Bollards

Structural assessment and advanced analysis of a mooring bollard supporting risk management, asset integrity and safe operations at mining and port berth infrastructure.