Our Projects
Explore Some Complex Projects the SIE Team Has Worked On, and Solutions We Have Delivered for Our Clients
Hopper Skirt Deflection
Advanced analysis by SIE resolved complex structural behaviour issues, reducing interface concerns and boosting reliability across plant assets.
See Project VideoMooring Winch Guards
3D reality model capture enabled SIE to engineer accurate, clash‑free guarding for a mooring winch, ensuring accurate and efficient installation.
See Project VideoReality Model 3D Scan
SIE’s 3D reality modelling services help identify defects, simplify contractor navigation, and enhance safe, predictable maintenance planning.
See Project VideoE-Crane Counterweight Restraint Design
Engineered restraint solutions for an E‑Crane by SIE, ensuring stability, compliance, and safe execution of the maintenance procedure.
See Project VideoMooring Bollard Integrity Review
Targeted engineering by SIE delivered modern bollard and bolt upgrades, reducing mooring related risks and strengthening port infrastructure.
See Project VideoBalanced Machine Weighing
Accurate weighing and engineered jacking solutions by SIE ensured verified stability and safe, reliable machine operation.
See Project VideoWharf Conveyor Support Upgrade
Designed and delivered an upgraded conveyor support system, ensuring uninterrupted production and long-term reliability.
See Project VideoShipunloader Tie-Pin Replacement
Engineered and executed a controlled tie‑pin repair procedure on a shipunloader, ensuring safe restoration and timely return to service.
See Project VideoHopper Spill Tray Replacement
Reverse engineered spill trays using site measurements and 3D modelling to deliver accurate, fabrication ready drawings.
See Project VideoTripper Upgrade
SIE developed a mast support solution that reduced truss loading, extended asset life and improved the safe, reliable operation of this tripper.
See Project VideoLighting Tower Relocation
SIE designed and delivered new berth lighting tower supports, providing a safe, reliable relocation solution that maintains ongoing port operations.
See Project VideoShuttle Replacement
SIE delivered the structural design for a replacement shuttle, providing a safe & reliable solution meeting operational requirements & demanding schedule.
See Project VideoFilter House Roof 3D Scan & Design Overlay
SIE used 3D reality capture to develop a permanent filter house roof design, avoiding clashes and reducing project risk.
See Project VideoConveyor Plinth Replacement
SIE rapidly delivered temporary & permanent engineering solutions, restoring safe operations & minimising downtime following a critical incident.
See Project VideoMooring Dolphin Walkway Upgrade
A new access walkway designed by SIE delivered safe and reliable mooring dolphin access, supporting ongoing port operations and personnel safety.
See Project VideoWe Have Experience Over a Broad Range of Mining, Ports and Heavy Industry Infrastructure. These Include:
Stackers

![]()
Reclaimers

![]()
Shiploaders

![]()
Unloaders

![]()
Trippers

Train Unloaders

Towers

Fixed Plant Facilities

![]()
Conveyor Systems

Rail

Port Facilities

Mooring Bollards