Mooring Dolphin Walkway Upgrade

Maintaining safe access to critical marine infrastructure requires engineering solutions that balance durability, functionality and personnel safety.

SIE was engaged to design a replacement walkway for our client's mooring dolphin access, with careful consideration given to its proximity to snap-back zones.

Our team completed the structural design, analysis and connection detailing, while also providing technical support throughout fabrication and on-site engineering assistance during installation.

The 35m span walkway was successfully crane-lifted into position under SIE supervision, delivering a safe and reliable access solution for ongoing operations.

 